Loading...

Renaissance Atyrau Hotel

Proje Detayları

İş Veren: Capital Partners

Yapılan İş: Plumbing system and armatures, domestic water filtration, storage and conditioning, swimming pool installation, underfloor heating installation, heating, cooling, ventilation, air conditioning system (2x950 kW split condenser air-cooled group, 2x 400 kW electric backup hot water boiler, 2x3200 kW main heating exchanger), fire extinguishing system, garden irrigation system, natural gas distribution, liquid fuel storage and distribution, steam generators (2x 500 kg/h), building automation etc.

Yer: Atyrau / Kazakistan

Kategori: Hotel

Proje Tarihi: 2006-06-30 00:00:00

All mechanical installation project and application works of the five-star International Hotel, consisting of 220 rooms, lobby, executive club, meeting rooms, restaurant, bar, ballroom, casino, shops, health club, indoor swimming pool, kitchen, laundry and technical areas. .